AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |
Back to Blog
Concrete Platform Draugen3/9/2024 In addition, water is injected into the reservoir through an extended-reach well drilled from the D template on the neighbouring Statfjord Nord satellite. Two production wells have been drilled through the template. The development solution embraces a subsea template, N, tied by a pipeline to the Statfjord C platform, which is 22 kilometres away. It was however the Romans, a little more than 2000 years ago, who really developed the knowledge and competence of how to create huge buildings based on using ashes from volcanoes as an important ingredient. The Sygna field is, like Statfjord Øst, shared between the two production licences 037 (55 %) and 089 (45 %). Concrete platforms for the North Sea The first traces of a material that can have some resemblance to concrete dates back 20 000 years. Like Statfjord Nord and Statfjord Øst, Sygna is a satellite fiels tied back to the Statfjord C platform. The Sygna oil field is located in the north-east corner of the Statfjord area in the Norwegian North Sea. Topside weight: 42,500 tons Concrete substructure weight: 310,500 tons Storage volume: 302,000 m 3 Total height: 271 metres Living quarters accommodate: 228 people. Roughly four million cubic metres of gas are exported daily by the Statfjord Unit. The production record for a single day on Statfjord was set on 16 January 1987, when 850 204 barrels were produced. These hydrocarbon-bearing sediments were all deposited in the Jurassic era, about 150 million years ago. They consist of sandstones, with the oil and gas held in pores between the individual sand grains. The hydrocarbon reservoir formations on Statfjord lie at depths of 2 500-3 000 metres.
0 Comments
Read More
Leave a Reply. |